Additions & Specialty

Home additions & specialty projects

Home additions, basement remodels, whole-home renovations, and insurance rebuilds managed end to end.

Home additions & <em>specialty projects</em>” />
    </div>
  </div>
</section>

<style>
.cmd-numbered-cards {
  padding: 68px 48px;
  background: linear-gradient(180deg, #FFFEF8 0%, #F5EFE2 100%); color: #06273A;
  font-family: 'Inter', sans-serif;
  position: relative;
  overflow: hidden;
}
.cmd-numbered-cards * { box-sizing: border-box; }
.cmd-numbered-cards .section-inner { position: relative; max-width: 1320px; margin: 0 auto; }
.cmd-numbered-cards .section-header {
  display: grid;
  grid-template-columns: 1fr 1fr;
  gap: 60px;
  align-items: end;
  margin-bottom: 48px;
}
.cmd-numbered-cards .eyebrow {
  display: inline-block;
  font-size: 12px;
  font-weight: 600;
  letter-spacing: 0.12em;
  text-transform: uppercase;
  color: #C08A4B;
  margin-bottom: 16px;
}
.cmd-numbered-cards h2 {
  font-family: 'Fraunces', serif;
  font-size: 44px;
  font-weight: 600;
  line-height: 1.08;
  color: #06273A;
  margin: 0;
}
.cmd-numbered-cards h2 em { font-style: italic; color: #C08A4B; font-weight: 500; }
.cmd-numbered-cards .header-right {
  font-size: 16px;
  line-height: 1.7;
  color: rgba(6,39,58,0.72);
  padding-bottom: 8px;
}
.cmd-numbered-cards .nc-grid {
  display: grid;
  grid-template-columns: repeat(4, 1fr);
  gap: 20px;
}
.cmd-numbered-cards .nc-card {
  background: #FFFEF8; border: 1px solid rgba(6,39,58,0.08);
  padding: 32px 26px;
  border-radius: 16px;
  transition: transform 0.3s, border-color 0.3s, box-shadow 0.3s;
}
.cmd-numbered-cards .nc-card:hover {
  transform: translateY(-4px);
  border-color: rgba(192,138,75,0.4);
  box-shadow: 0 24px 50px rgba(6,39,58,0.08);
}
.cmd-numbered-cards .nc-num {
  font-family: 'Fraunces', serif;
  font-size: 46px;
  font-weight: 600;
  color: #C08A4B;
  line-height: 1;
  margin-bottom: 14px;
}
.cmd-numbered-cards .nc-label {
  display: inline-block;
  font-size: 11px;
  font-weight: 600;
  letter-spacing: 0.1em;
  text-transform: uppercase;
  color: #C08A4B;
  background: rgba(192,138,75,0.12);
  padding: 5px 10px;
  border-radius: 4px;
  margin-bottom: 12px;
}
.cmd-numbered-cards .nc-card h3 {
  font-family: 'Fraunces', serif;
  font-size: 20px;
  font-weight: 600;
  color: #06273A;
  margin: 0 0 10px;
  line-height: 1.25;
}
.cmd-numbered-cards .nc-card p {
  font-size: 14px;
  line-height: 1.65;
  color: rgba(6,39,58,0.72);
  margin: 0;
}

@media (max-width: 1024px) {
  .cmd-numbered-cards { padding: 54px 32px; }
  .cmd-numbered-cards .section-header { grid-template-columns: 1fr; gap: 20px; margin-bottom: 40px; }
  .cmd-numbered-cards h2 { font-size: 34px; }
  .cmd-numbered-cards .nc-grid { grid-template-columns: repeat(2, 1fr); }
}
@media (max-width: 768px) {
  .cmd-numbered-cards { padding: 40px 20px; }
  .cmd-numbered-cards h2 { font-size: 28px; }
  .cmd-numbered-cards .nc-grid { grid-template-columns: 1fr; gap: 14px; }
  .cmd-numbered-cards .nc-card { padding: 24px 22px; }
  .cmd-numbered-cards .nc-num { font-size: 38px; }
}
</style>

<section class=
Project Catalog

Four kinds of complex projects we run

Additions, basements, whole-home renovations, and insurance rebuilds share one thing: they need a patient GC who can coordinate across trades over a long timeline.
01
Expand up

Additions & second stories

Add square footage with framing, roof tie-in, electrical, plumbing, and finish. Typical build 3-6 months.

02
Expand down

Basement finishing

Moisture control, framing, egress, electrical, plumbing, and finish. 6-12 week typical build.

03
Whole home

Full home renovation

Gut rebuilds, layout changes, and top-to-bottom finish work. 6-12 months depending on scope.

04
Insurance

Insurance rebuilds

We coordinate with your adjuster, negotiate supplemental claims, and rebuild to current Oregon code.

For projects that do not fit one room

One project manager on site from start to finish so decisions do not get lost between trades.

CM&D has managed every variation: second-story additions, bump-outs, basement finishing, whole-home renovations, and insurance rebuilds after fire or water damage. Because these projects touch framing, electrical, plumbing, HVAC, roofing, and finish work, consistent project management is the difference between a 6-month and a 12-month schedule.

For insurance rebuilds specifically, we also coordinate directly with your adjuster and negotiate supplemental claims when the original scope of loss misses something.

Ready When You Are

Let’s build the home you’ve been planning

Tell us about your project and Miles will follow up within one business day to schedule a no-obligation consultation at your home.

Licensed CCB #112648 Serving Portland since 1996 Family owned, Portland local